LNG Import Terminal Regasification Module – Bahrain
Project Scope: Engineering, Procurement & Fabrication of Jacketed Regasification Platform
The module, weighing 7,200 MT and measuring 70 m (L) X 40 m (B) X 20.5 m (H), is the first jacketed LNG regasification platform in the world at the time. It uses open rack vaporizers to re-gasify up to 800 MMSCFD of LNG in 5 parallel trains (4 in duty and 1 in standby).
Key Highlights:
- Over 4,000,000 Man-hours completed without LTI over 18 months
- Engineering & Procurement carried out in Dubai – U.A.E
- Fabrication carried out in Thailand through fabrication subcontractor
Location
Bahrain
Contract Awarded
2016